TS SOLAR
Crescent Valley, NV | 2023-2024
BUDGET : $26,700,000
BOS
AC/DC Feeder Installation, Termination, and Testing; MET Station Installation; Fiber Optic Installation and Testing; Ground Grid Testing; Tracker Cable Installation and Termination; SLA/BLA Remediation; Module Remediation
COLLECTIONS
Wire Installation; Substation Terminations; Testing and Commissioning
PLANT SIZE
200 MWac (1678 acres)
SOLAR ARRAYS
48 TMEIC Inverters; 1062 Load Break Disconnects
MV CABLE
420,000 LF of AC Feeder; 1,310,000 LF of DC Feeder