CHAPARRAL SPRINGS

Rosamond, CA | 2023

BUDGET : $31,000,000
PROVIDE AND INSTALL

CAB System, DC Feeder & Ground; Inverters, DC Terms, AC Feeder, Sectionalizer Cabinets, Fiber Optic Cable, SCADA, String Wire/Harness, Wire Management, CBXs

TESTING

CBXs; Fiber Terms; Pre-Functional

COLLECTIONS

Wire installation; Substation Terminations; Testing and Commissioning

PLANT SIZE

174 MWac/215 MWdc
(Site Area 430 Acres)

SINGLE AXIS TRACKER

NEXTracker Horizon “6,077 Module Single Axis Trackers”

SOLAR ARRAYS

53 Sungrow Inverters, 865 CBXs, 360,372 FS Series 6+ modules, 415,440 FS Series 4 modules

FEEDER TRENCHING

92,500 LF of plowed-in MV Cable

DC SOURCE CIRCUITS

60,062 Series 6 Voltage strings, 27,696 Series 4 Voltage Strings

SOLAR WORKERS

~375 Workers at Peak Manpower

The Chaparral Springs Solar facility has a 25-year life expectancy. The facility will generate ~504,600 MW of power annually, providing enough solar energy to meet the needs of 30,000 average households and displacing around 297,000 metric tons of carbon dioxide each year, equivalent to removing nearly 43,500 cars from the road.